Bathrooms
Down to the studs, a waterproof membrane on every wet wall, then tile, fixtures and glass. Moving the toilet or shower drain is usually possible; we check the joists first.
- On site
- about 4 to 5 weeks
- Permit
- plumbing permit; electrical if circuits change
- Out of use
- the whole build, so we plan around your other bathroom