SAMPLE — Sumas Hollow Landscapes is a made-up business. Sample site built by Fraser Web Co. · See the "before"
Call 604-555-0153

Abbotsford backyards, built for the rain.

Design-build landscaping across the Fraser Valley: paver patios, retaining walls, drainage for clay yards, and planting. One crew from the first sketch to the last shrub.

A finished backyard: charcoal paver patio, curved block retaining wall and planted bed in front of a cedar fence, wet after rain
Patio, wall and planting, finished in October

The yard visit is free.We walk the yard with you, check where the water sits and give you a ballpark on the spot.

A drawn plan is $400.Scaled plan, plant list and a fixed price. Every dollar comes off the build if we do it.

The price doesn't move.If we hit something under the ground we didn't expect, you hear about it before we spend a cent on it.

What we design and build

  • Paver patios and walkways

    Concrete or natural-stone pavers on a base dug for Fraser Valley clay, sloped away from the house, with polymeric sand in the joints.

  • Retaining walls

    Block walls to level a sloped yard or hold a raised bed. Walls taller than about 1.2 m (4 ft) usually need an engineer's design and a City permit; we tell you at the visit if yours does.

  • Drainage for wet yards

    French drains, regrading and downspout runs for the lawn that turns to a pond every November.

  • Planting and lawns

    Beds, hedges and trees that suit a wet winter and a dry August, plus new lawn on proper topsoil.

  • Steps, edging and lighting

    Block or slab steps, steel or stone edging, and low-voltage path lights to finish it off.

A French drain going in beside a soggy lawn: perforated black pipe on drain rock in a fabric-lined trench, a puddle on the grass beside it
A French drain going in along a fence line. The puddle on the right is why.

What goes under a patio that lasts

Most sunken, heaving or weedy patios failed below the pavers. Here is what goes under ours, and why the clay under most Fraser Valley yards needs more of it.

What's under your lawn?

We dig about 29 cm before the first paver goes down.

Drawn to scale for depth. The slope is drawn steeper than real so you can see it.

  1. Pavers 6 cmPatio-grade concrete pavers. Joints are swept with polymeric sand, which sets firm and keeps weeds and ants out.
  2. Bedding sand 2.5 cmCoarse concrete sand, screeded flat. Never stone dust: it holds water, and the pavers start to rock.
  3. Crushed gravel base 20 cm19 mm crushed gravel, compacted with a plate compactor in layers about 10 cm thick. A thin or loose base is what makes ruts and dips.
  4. Filter fabric on clayWoven fabric laid on the clay. Without it, wet clay squeezes up into the gravel and the base slowly turns to mud.
  5. Drain at the low edge on clayA perforated pipe in clean drain rock carries water away instead of letting it sit under the patio all winter.
  6. A 2% fallAbout 2.5 cm over every 1.2 m, away from your foundation, so rain runs to the lawn, not your basement.

From the first visit to the first big rain

  1. Yard visit

    Free · about an hour

    We walk the yard, look at where water sits, measure the slopes and check whether a mini-excavator fits through your side yard.

  2. Drawn plan

    $400 · credited to the build

    A scaled plan, materials, a plant list and one fixed price. Change it until it's right; the plan is yours either way.

  3. Build

    Most patios: 1 to 2 weeks

    Lawn and driveway covered with plywood, one crew lead on site every day, and a short update each evening.

  4. First-rain check

    Included

    After the first heavy rain we come back to see where the water actually goes, and fix it if it isn't going where we said.

The part nobody photographs

Finished yards all look good on day one. The before, and the hole in between, are what tell you whether it will still look good in five winters.

A patio dig in progress: fabric-lined hole with compacted crushed gravel, string lines on stakes, a pallet of pavers and a wheelbarrow on the lawn
Day three: fabric down, gravel base compacted, string lines set to the 2% fall.
The finished patio and retaining wall after rain, with water running off toward the lawn
Finished: water runs off to the lawn, not toward the house.

Sample photos. On your site, these are your own before, during and after shots from real jobs.

What Fraser Valley homeowners say

"They dug out our soggy corner and ran a drain to the back of the lot. First winter in eight years without a pond next to the patio."

Karen L., East Abbotsford

"The plan was $400 and it came off the final bill like they said. Wall and patio took nine working days."

Dev P., Mission

"Tidy crew and a good result. One gravel delivery was a day late and pushed us back, but they called us the same morning."

Stu M., Chilliwack

Sample reviews. On your site, we quote your real Google reviews word for word, with their stars.

Where we work

Abbotsford Mission Chilliwack Aldergrove Langley

We build year-round. Fall and early spring are the best times to plant here, so book a visit before the beds you want go in.

Mon – Fri
7:30 am – 5 pm
Saturday
Yard visits by appointment
Sunday
Closed

Book a free yard visit

Tell us roughly what you're picturing. We'll call back within one working day to set a time.

What are you thinking about?
This is a sample site — the form doesn't send. On your website, this form emails you the job details and a phone number to call back.
Tap to call 604-555-0153