Decks built for Maple Ridge rain
Composite, cedar and vinyl sundecks, covered decks and rot repair in Maple Ridge, Pitt Meadows and nearby. We draw the permit plans and book the City inspections.
- Written quote before we start
- Permit drawings included
Where does the rain go?
Most deck decisions here come down to one question: what is under it? Pick what sits below your deck and what goes on top, and watch the water.
What we build
- New decks
- Composite or cedar, from a low backyard platform to a second-storey deck with stairs.
- Vinyl sundecks
- Waterproof decks over bedrooms, family rooms and carports, flashed into the wall and under the door.
- Covered decks
- Timber or aluminum roofs, with clear panels where the room behind needs the light.
- Rebuilds and rot repair
- New ledger, joists and posts under a tired deck, or a full tear-out and rebuild.
- Re-surfacing
- New vinyl or new boards over a frame that is still sound.
- Railings and stairs
- Aluminum picket or glass, at the heights the BC Building Code asks for.
A roof, so you use the deck in November
An open deck here mostly sits empty from October to April. Put a roof over part of it and it becomes the place for the barbecue, the boots and the dog all winter.
- Timber post and beam with clear panelsKeeps the rain off and the light in, so the kitchen behind it doesn't go dark under grey skies.
- Solid roof with a finished ceilingRoom for pot lights and a heater. Darker underneath, so best on a south or west side.
- Aluminum patio coverSlim, low upkeep, and a good fit over an existing deck.
What the City asks for on a deck
- A zoning check, plus setbacks if a stream or pond runs on or beside your lot.
- A structural engineer's sealed design if the deck has a roof attached, glass in the railing, or cantilevers more than 24 inches.
- Two sets of scaled plans and a metric site plan showing the distance to every property line.
- A BC Land Surveyor's certificate on site at the footing inspection (lots under an acre).
Finished decks
Sample photos. On your site, this is your own finished work.
Old deck? Check these five things first
Ten minutes with a flashlight and a screwdriver tells you whether you need new boards or a new deck.
- The ledger, where the deck meets the housePush a screwdriver into it. If it sinks in, the rot is in the board holding the deck up, and water may be getting into the wall too.
- Posts at the groundPosts buried in soil or sitting in puddles rot from the bottom. They should stand on concrete with a gap underneath.
- The railingLean on it at each post. Any give means loose bolts or soft wood at the base.
- Soft or bouncy boardsA spongy spot usually means a rotten joist under it, not just a tired board.
- The ceiling below a sundeckBrown rings or bubbling paint under a vinyl deck mean the membrane, the door flashing or a seam has failed.
What Maple Ridge says
"Our old sundeck had been leaking into the kitchen for two winters. They found the bad seam at the door, replaced the vinyl and the ceiling is still dry after this fall's storms."
Sample review · Karen L., Albion
"Talked us out of glass railing on the covered part, which saved us the engineer's fee. The permit was sorted without us chasing anyone."
Sample review · Dev P., Pitt Meadows
"Started a week later than planned because of the rain, but they told us early and the composite deck came out exactly like the drawing."
Sample review · Tom R., Silver Valley
Sample reviews. On your site, we quote your real Google reviews word for word, with their stars.
Where we build
Based in Maple Ridge. We quote on site anywhere in these towns.
- Maple Ridge
- Pitt Meadows
- Mission
- Port Coquitlam
- Langley
Book a free estimate
Tell us about the deck. We'll call you back within one business day to book a time to measure.